The machines stopped singing,started shouting.They were shouts accompanied by the sound of some part of the machine coming off,or by the sound of some rock thrown by some child.Gradually the factory was considered abandoned,although some mouse family converted it into its house.Toti continued there,with an iris in the hand and a flower in the bottom,searching where everybody has come.
- : 4
- : Clowning
TECHNICAL REQUIREMENTS
- :
40 Dimmer channels 1 programmable lighting console 6 1 kW profiles, Robert Juliat + 2 gobo holders + 1 iris 6 550 W profiles, ETC junior 23 1 kW PC + barn doors + gel holders 3 PAR 64 + gel holders 4 flown bars on stage 1 FOH lighting bar 4 lateral fixture structures (dance stands) 3 spotlight floor stands 4 direct 220/230 V power switches on stage - :
P.A. system fitting the space needs 1 sound console (minimum 6 microphone channels + 3 sereo channels + 2 aux.) 1 monitor upstage left 2 D.I. 2 micro AKG (accordion) 1 micro ATM35 (violin) 1 micro SHURE SM58 (voice) 6 sound connections upstage left - : 220 Volt
- : Square
- : All Ages
- : 8 mt (lenght) x 6 mt (width) x 5 mt (height)
- : Show duration 60 min; Setting up 300 min; Dismantling 90 min
- :
Stage opening a minimum of 8m wide, 6m deep, 5m high Black horizon: 2 sets legs, left and right to create wings Back drop with a minimum (1.5m) clear space upstage from drop to wall 1 free flown bar for electromagnets installation 1 free flown bar for performance elements
COMPANY PROFILE AND CONTACT